Produces the morning production report: output against plan by line, cell and product; OEE with availability, performance and quality shown separately; the downtime log ranked both by minutes and by frequency; scrap and downtime priced in dollars; week-over-week movers; and the exceptions needing a decision today. For each significant exception it drafts a specific reschedule or changeover move with its consequences traced, never a re-optimised day. Reads the consolidated dataset and leads with data freshness. When the plant has a floor plan on file, or attaches one, it also draws each machine's OEE, availability and downtime on a schematic of the floor. Use when someone says "morning report," "production report," "how did we do yesterday," "what's our OEE," "downtime report," "what's late," or "what do I take into the production meeting."
工具 Tools调试工具需海外环境待翻译
最近源活动
—
检测 SKILL.md 语言
en
星标 ★
47,734
分支 Fork
0
安装选项
提示
指令
使用 AI 助手安装
将下面的提示复制到你正在使用的 AI 助手中。
下载完整 Skill 目录(含全部配套文件)。 下载压缩包 ↓
SKILL.md 原文预览

Daily Production Report

Every plant runs a morning production meeting, and somebody spends 60 to 90

minutes before it assembling the same report by hand out of the same four or

five exports. This is that report.

Chain 3 runs this overnight, so the page exists before anyone asks for it.

The run is built to be safe unattended — it asks nothing, it is idempotent, and

it reports its own gaps. The trigger is the host's, not the plugin's: see

../../shared/scheduling.md. Never tell a user the report has been scheduled.

That is the clearest demonstration of the plugin's concept, and it

is why the run must be idempotent — a re-run rewrites the same report for that

production day rather than producing a second one.

Quick start

→ Confirm freshness; if last night's export didn't land, lead with that
→ Output against plan by line, cell, product, with variances
→ OEE per asset or line, three components always shown separately
→ Downtime ranked by minutes and by frequency, both
→ Price scrap and downtime in dollars, with the rate assumption stated
→ Week-over-week movers from history: the pulse's day records, or the exports
→ Fold in any breakdown diagnoses
→ Exceptions, each with its impact on a commitment
→ One traced reschedule move per significant exception, drafted not applied
→ Floor view: each machine's figures drawn where it sits; set up once from a
  floor plan, confirmed by a person, saved on the plant setup page
→ Page saved to report-output/; the reply is a ~150-word summary naming it
→ Run alone: never publishes. End with the placement line, "save it over yesterday's"

Inputs

First, find the plant setup: from the task's own folder (never cd into the plugin), run

python3 -I <this skill's folder>/../../shared/scripts/plant_setup.py find, do its setup_page_first step, then read the profile at

profile_path and any rate at rates_path, per ../../shared/replies.md.

| Input | Source | Form |

|---|---|---|

| Consolidated dataset | data-consolidate | Primary input. ../../shared/contracts/consolidated-dataset.md |

| New breakdown diagnoses | breakdown-diagnosis | ../../shared/contracts/downtime-record.md |

| Production plan / schedule | Planning export to the M365 folder | CSV / XLSX |

| Actual output, good and scrap | MES export to the M365 folder | CSV / XLSX |

| Downtime events with reason codes | MES or historian export | CSV |

| Standard cost per part | The ERP. Infor M3 gives none (../../shared/erp-connectors.md): the profile's cost read order applies | Connector |

| Open work orders and due dates | The ERP | Connector |

| Maintenance work orders in progress | CMMS | CMMS connector, else the maintenance export |

| Stored day history, inside Chain 3 only | morning-plant-pulse | ../../shared/contracts/pulse-day-record.md |

| Floor layout (optional) | The ### Floor layout - <site> section of the plant profile at profile_path (the plant setup page) | ../../shared/contracts/floor-layout.md |

| Floor plan (optional, setup only) | A PDF or image the user attaches | Read once, in the setup turn of step 9a; never stored |

| OEE thresholds (optional) | The plant profile's OEE thresholds line | Defaults apply, labelled not confirmed, when absent |


Workflow

Step 1 — Confirm freshness

Confirm freshness via data-consolidate — the data quality report and each

row's as_of. **If last night's export did not land, say so at the top of the

report**, directly under any safety block. Nothing about data age goes above a

safety-flagged record, not even a one-line note.

A source whose timestamps run later than now is flagged future_timestamp:

say its dates can't be trusted and give it no age. A production report built on

stale data is worse than no production report,

because it gets believed and acted on. Never silently reuse yesterday's data.

The rule is ../../shared/absent-is-not-zero.md.

On reading both the dataset and the raw exports. The dataset is the primary

input — it carries the freshness picture and the classified key mismatches. The

plan, output and downtime exports give rows at their native grain. Where the two

disagree on a count, report both and name which is which; a discrepancy is a

finding about the export, not a number to choose between. See *What this dataset

is authoritative for* in ../../shared/contracts/consolidated-dataset.md.

Step 2 — Output against plan

By line, cell and product, with variances. Use the plant's own word for the

organizational unit, from the ## Plant context block.

**Where plan and output spell a part differently, do not match them silently,

and do not refuse to match them.** Run on raw exports, the plan says

PN-4471-B and the M

评论
Aanthropics
anthropics
anthropics/claude-plugins-official
查看 GitHub 仓库 查看作者的其他 Skill
来源信息
作者@anthropics
所属大类工具 Tools / 调试工具
国内可用性需海外环境
最近源活动—
风险提示无
提示:风险标签为程序静态扫描结果,仅作提示,不代表安全认证。安装前请阅读 SKILL.md 及其引用的脚本、权限,自行判断是否可信。